This is the first week that I have toured inside the building in a while so there is much progress to report. The First Floor retail spaces and fitness room are enclosed. The Second Floor units are mostly complete with drywall, taping, and mudding. The Third Floor is continuing to be drywalled. In the meantime, celloluse insulation is being pumped and sprayed into the walls where possible. This is mostly in all of the exterior walls and corridor walls. Unfortunately, since there is no backing in the demising walls between units, this method could not be used. The cellulose product excels in filling all of the gaps between the wall studs and has a slightly better R-value and provides better sound insulation than regular batt insulation. On the roof, the white EPDM membrane is in place. On the exterior, the brick is complete on the north elevation. The masons will move onto the east elevation next to maximize the available daylight hours. Stucco is being applied to the south elevation.

:::No Weekly Slice of RiverClay PAN

2 comments:

Mrs. Brent said...

The pictures look great! Will you be able to move into the condo by May 1st? In any case, the place will be awesome!

Freddy Fred said...

As far as I know, the move-in schedule is still for the end of May / beginning of June.