Thursday, June 19, 2008

Closing and Move-In

::: Hey Everyone and Future Neighbors!

Hope all of you have had successful final punches and closings on your condos. I'll be moving into #301 early next week. My appliances have been delivered and the walls are painted. I'm looking forward to meeting all of you in the corridor, elevator, or parking garage, or just knock on my door. Short of a final RiverClay PAN, this will be my final post. It's been a long journey and thanks to everyone for following along with me from Day 1 through this point. I encourage everyone to scroll through the weekly PANs that I have posted. It's quite incredible how far we have come!

Cheers,
Fred

Friday, March 28, 2008

RiverClay Preview Opening

::: For those of you who missed the RiverClay Preview Opening event on March 14th, like myself, or those who want to relive the event, here are a few photos of the model unit (#603).

























::: Also here is a link to more photos from the party:

http://www.PictureTrail.com/gid19263949&pathID=1944049

The password for the album is "River Clay"

Thursday, March 27, 2008

March 26th

::: By Owners' requests, here are progress photos of some individual units:



:::FotoCap 1: Individual storage compartments have been started in the upper parking level.







:::FotoCap 2: Unit #209 (Jeanne) - sorry, the front door was locked so I couldn't get any photos of your unit.







:::FotoCap 3: Unit #300 (Jeff and Pat) - Main Living Room area








:::FotoCap 4: Unit #300 - Kitchen area








:::FotoCap 5: Unit #300 - Guest bathroom wall tile











:::FotoCap 6: Unit #300 - Full length deck








:::FotoCap 7: Unit #301 (My Unit) - Kitchen area








:::FotoCap 8: Unit #301 - Dining nook








:::FotoCap 9: Unit #301 - Master bath tub deck








:::FotoCap 10: Unit #301 - Main deck








:::FotoCap 11: Unit #303 (Scott and Michelle) - Art niche and Kitchen space








:::FotoCap 12: Unit #303 - Guest bathroom (awesome mosaic tile floor!)







:::FotoCap 13: Unit #303 - Kitchen area








:::FotoCap 14: Unit #303 - Huge deck








:::FotoCap 15: Unit #304 (Ian) - Guest bathroom








:::FotoCap 16: Unit #304 - Kitchen cabinets








:::FotoCap 17: Unit #304 - Kitchen cabinets - the other half








:::FotoCap 18: Unit #304 - Exterior deck








:::BONUS: Unit #304 - Video footage of the Master Suite




:::FotoCap 19: Unit #403 (Jesse and Josh) - Living/Dining area








:::FotoCap 20: Unit #403 - Kitchen area








:::FotoCap 21: Unit #403 - Master tub/shower (Love the dark tile!)











:::FotoCap 22: View from the 5th Floor deck (Unit #501)








:::No Weekly Slice of RiverClay PAN this week

March 19th

Sorry for the delay in getting the blog updated. I've been going through some issues this past month that have sidetracked my efforts, including having to rebuild my computer. Anyway, I bring you the belated report from March 19th:


:::FotoCap 1: View from the corner of River and Clay Streets.








:::FotoCap 2: View looking west from River Street.








:::FotoCap 3: View looking at a bay of the west elevation.








:::FotoCap 4: View from Clay Street looking at the south elevation.





Observations:::
The weather has warmed up and most of the plastic wrap is now off of the building exterior, revealing the brick and stucco'd facades with metal balcony railings and details. Most of the work continues to be focused inside the units as we get closer to the opening date.

Stay tuned for this week's current post which will include photos of the units per request.

:::Weekly Slice of RiverClay PAN

Monday, March 10, 2008

FUTURE SITE VISIT REQUESTS

Hey everyone,

As the building interiors are quickly progressing, I wanted to welcome any requests from the homeowners and my future neighbors to have me take and post photos of your units for the blog. Otherwise, to respect everyone's privacy, I will continue to post the interior photos, but without labels for any individual unit unless specified.

Thanks,
Fred, #301
Blogmaster

Thursday, February 28, 2008

February 27th


:::FotoCap 1: View looking at Unit Plan 'M' Living Room.








:::FotoCap 2: View looking at Unit Plan 'M' Kitchen.








:::FotoCap 3: View looking at Unit Plan 'D' Kitchen.








:::FotoCap 4: View looking at Unit Plan 'D' Master Bath.








:::FotoCap 5: View looking at Unit Plan 'D' Master Closet.








:::FotoCap 6: View looking at Unit Plan 'C' Kitchen.








:::FotoCap 7: View looking at Unit Plan 'C' Master Bath.








:::FotoCap 8: View looking at Unit Plan 'J' Kitchen.








:::FotoCap 9: View looking at the photovoltaic panel installation on the Roof Level.





Observations:::
Very exciting news from this week's site walk: Work continues on the exterior stucco and brick columns. On the interior, individual unit finishes are being installed on the 2nd Floor which includes kitchen cabinets and countertops, bathroom cabinets and fixtures, and closet doors. On the 3rd Floor, drywall is almost done and being prepped for unit finishes to begin. On the Upper Floors, wall insulation and drywall are progressing. On the Roof Level, photovoltaic panels are being installed along the west and east sides.

:::No Weekly Slice of RiverClay PAN this week

Wednesday, February 13, 2008

February 13th


:::FotoCap 1: View looking at the exterior stucco on the south elevation from Clay Street.







:::FotoCap 2: Close-up view of the decks from Clay Street.








:::FotoCap 3: View of the east elevation from River Street.






Observations:::

Another drive-by this week. Brick veneer continues to be applied to the upper column locations. Finished stucco has begun on the west elevation setbacks and deck ceilings. Finished stucco work continues on the upper floors of the south elevation. Brick veneer continues on the east elevation as well. Celloluse insulation continues to be fed into the Third Level.

:::Weekly Slice of RiverClay PAN

Monday, February 4, 2008

January 30th


:::FotoCap 1: View looking at the exterior stucco on the south elevation from Clay Street.







:::FotoCap 2: Close-up view of the west elevation from Clay Street.








:::FotoCap 3: Close-up view of the decks on the west elevation.






Observations:::

From this week's drive-by, work continues on the exterior decks. Brick veneer is being applied to the column locations and the scratch coat of gray stucco is being placed on the west elevation. Finished stucco is mostly complete on the south elevation. The rest of the building is still being covered with plastic wrap.

:::Weekly Slice of RiverClay PAN